OTT Work in Progress
OTT is developing new technologies which are subject to confidentiality agreements with the various clients. The table below summarizes the real activity in a generic sense. Prospects at lesser stages of development are omitted. For greater detail, it would be necessary to enter into a confidentiality agreement with the interested party. This involves getting the permission to disclose from the client in question. This table will be updated on a monthly basis.
| Project | Description | Innovative Aspects | Status |
| Turnkey West Africa IGCC Facility |
![]() The generation of 20 megawatts of power from municipal solid waste by use of the Integrated Gasification and Combined Cycle (IGCC) technology |
Design and build a unique reactor and purification methodology to produce a syngas suitable for gas turbines | Preliminary Engineering and EIS done - Awaiting Financing |
| Mobile Medical Waste Incineration System for the Pacific Rim |
![]() 150 kilogram per hour mobile medical waste incineration system |
Continuous infeed, multi stage air pollution control including mercury capture. Continuous extraction and separation of fused (vitrified) ash from metal - metal is recycled and the vitrified ash is used for construction. This is a "no waste out" system | Basic design complete - await final approval from client |
| Energy generation from municipal solid waste |
![]() Modular facility for generating electric power from 75 metric tons per day municipal solid waste. |
Oxygen blown gasification on a unique vibratory hearth(patent pending) with syngas cleaning using a proprietary molten salt system rather than conventional aqueous scrubbing or alkaline and activated carbon filtration | MOU for facility to be placed in EU signed - Completing negotiations for turnkey contract |
| New Jersey Pilot Facility - USA |
Image not permitted by client Production of Fischer-Tropsch Diesel fuel from 200 tons per day of scrap tires and plastic |
Operation at 30 atmospheres pressure with zero gas leakage and special reactor design | Awaiting proposal acceptance and kickoff |