This is a listing of designed and projected waste processing facilities that will be updated periodically as new material is prepared for release.

Yaroslavl – in the Russian Federation

OTT has just completed the detailed design of the first unit which will incorporate all of the OTT options to make the facility truly "Waste In – No Waste Out".

The client, located north of Moscow on the Volga River, is one of the largest petrochemical complexes in Europe. The facility will treat:

The process will feature the following:

Boryslav – in the Republic of Ukraine

OTT has completed the preliminary design of a facility similar in nature to the Yaroslavl system but which also envisions the utilization of a gas turbine electric power generator to process hydrocarbon gas, which is available from a local refinery.

The facility will process the wastes associated with an operation to drill 20 new oil wells in the Carpathian mountain region of the Ukraine. Some of the local wastes will be processed as well. The specific waste streams will include:

The process will feature the following:

Taipei, Taiwan – Client – TPI

For further information regarding OTT project work please contact Kenneth Hladun.